新聞資訊
聯(lián)系我們
山東蘭天篷膜安裝工程有限公司
聯(lián)系人:張經(jīng)理
電話:15064156568
網(wǎng)址:http://www.jyxingyu.com
地址:山東省濟(jì)南市市中區(qū)建設(shè)路99-5號(hào)一層?xùn)|戶
停車棚在建設(shè)以及施工時(shí)要注意的事項(xiàng)
來源:http://www.jyxingyu.com/ 日期:2023-04-03 發(fā)布人:
隨著社會(huì)經(jīng)濟(jì)的迅速發(fā)展,膜結(jié)構(gòu)的停車棚的使用也越來越多,透光性是現(xiàn)代膜結(jié)構(gòu)停車棚被廣泛認(rèn)可的特性之一。膜材的透光性可以為建筑提供所需的照度,這對(duì)于建筑節(jié)能十分重要?,F(xiàn)在我們就來了解下濟(jì)南停車棚在建設(shè)以及施工時(shí)要注意的事項(xiàng)。
With the rapid development of social economy, the use of membrane structure parking sheds is also increasing. Light transmittance is one of the widely recognized characteristics of modern membrane structure parking sheds. The light transmittance of membrane materials can provide the required illumination for buildings, which is very important for building energy conservation. Now let's learn about the construction and precautions for parking sheds in Jinan.
A、加工準(zhǔn)備及下料:依據(jù)施工圖放樣,放樣和號(hào)料時(shí)要預(yù)留焊接收縮量和加工余量,依據(jù)放樣作樣板。
A. Processing preparation and blanking: Set out according to the construction drawing, reserve welding shrinkage and machining allowance during setting out and marking, and use the setting out as a template.
B、預(yù)埋件安裝處理:定位預(yù)埋件安裝位置,打鉆安裝。要求預(yù)埋件位置準(zhǔn)確、埋設(shè)牢固。標(biāo)高偏差不大于9mm,左右位移不大于20mm。
B. Installation treatment of embedded parts: locate the installation position of embedded parts, and drill for installation. The embedded parts shall be accurately positioned and firmly embedded. The elevation deviation shall not be greater than 9mm, and the left and right displacement shall not be greater than 20mm.
C、測(cè)量放線:依據(jù)土建標(biāo)高基準(zhǔn)線測(cè)預(yù)埋件標(biāo)高線,檢查預(yù)埋件標(biāo)高偏差、左右偏差。整理結(jié)果,確定預(yù)埋件分隔的調(diào)整處理方案。
C. Surveying and setting out: measure the elevation center line of embedded parts according to the civil engineering elevation reference line, and check the elevation deviation and left and right deviation of embedded parts. Organize the results and determine the adjustment and treatment plan for the separation of embedded parts.
D、懸掛臂安裝焊接:懸掛臂安裝采用焊接,需檢查焊接節(jié),調(diào)節(jié)懸掛臂設(shè)計(jì)坡度,準(zhǔn)確無誤方能進(jìn)行焊接。靠邊一條懸掛臂準(zhǔn)確無誤后,安裝另一邊一條懸掛臂,就位準(zhǔn)確后點(diǎn)焊。
D. Suspension arm installation and welding: The suspension arm installation adopts welding, and it is necessary to check the welding joints, adjust the design slope of the suspension arm, and conduct welding only if it is accurate and correct. After the suspension arm on the side is accurate, install the other suspension arm, and conduct spot welding after it is correctly positioned.


停車棚在施工時(shí)的步驟:
Steps for construction of parking sheds:
一,加工準(zhǔn)備及下料:依據(jù)施工圖放樣,放樣和號(hào)料時(shí)要預(yù)留焊接收縮量和加工余量,依據(jù)放樣作樣板。
1、 Processing preparation and blanking: Set out according to the construction drawing, reserve welding shrinkage and machining allowance during setting out and blanking, and use the setting out as a template.
二,預(yù)埋件安裝處理:定位預(yù)埋件安裝位置,打鉆安裝。要求預(yù)埋件位置準(zhǔn)確、埋設(shè)牢固。標(biāo)高偏差不大于9mm,左右位移不大于20mm。
2、 Installation and processing of embedded parts: locate the installation position of the embedded parts and drill for installation. The embedded parts shall be accurately positioned and firmly embedded. The elevation deviation shall not be greater than 9mm, and the left and right displacement shall not be greater than 20mm.
三,測(cè)量放線:依據(jù)土建標(biāo)高基準(zhǔn)線測(cè)預(yù)埋件標(biāo)高線,檢查預(yù)埋件標(biāo)高偏差、左右偏差。整理結(jié)果,確定預(yù)埋件分隔的調(diào)整處理方案。
3、 Surveying and setting out: measure the elevation center line of embedded parts according to the civil engineering elevation reference line, and check the elevation deviation and left and right deviation of embedded parts. Organize the results and determine the adjustment and treatment plan for the separation of embedded parts.
四,懸掛臂安裝焊接:懸掛臂安裝采用焊接,需檢查焊接節(jié),調(diào)節(jié)懸掛臂設(shè)計(jì)坡度,準(zhǔn)確無誤方能進(jìn)行焊接??窟呉粭l懸掛臂準(zhǔn)確無誤后,安裝另一邊一條懸掛臂,就位準(zhǔn)確后點(diǎn)焊。
4、 Suspension arm installation and welding: Suspension arm installation adopts welding. It is necessary to inspect the welding joints, adjust the design slope of the suspension arm, and conduct welding only if it is accurate and correct. After the suspension arm on the side is accurate, install the other suspension arm, and conduct spot welding after it is correctly positioned.
通過以上小編的詳細(xì)介紹,我們對(duì)以上的信息有所了解,希望以上有您需要的信息,需要幫助的可以及時(shí)聯(lián)系我們。更多事項(xiàng)就來咨詢我們http://www.jyxingyu.com吧!
Through the detailed introduction by the above editor, we have gained some understanding of the above information. We hope that you have the information you need above. If you need help, please feel free to contact us in a timely manner. For more information, please consult us http://www.jyxingyu.com Come on!
下一篇:伸縮蓬的購買以及安裝事項(xiàng)了解 上一篇:該如何安裝和使用推拉篷呢?
推薦閱讀/ Recommended reading
- 濟(jì)南雨棚使用的核心的優(yōu)勢(shì)是什么? 2026-07-25
- 膜結(jié)構(gòu)球場(chǎng)看臺(tái)設(shè)計(jì)的規(guī)范要點(diǎn) 2026-07-23
- 崗?fù)ぜ友b伸縮雨棚的優(yōu)勢(shì)在哪? 2026-07-20
- 伸縮雨棚和固定雨棚哪個(gè)好? 2026-07-18
充電樁車棚定制大跨度的原理
[2026-07-28]
結(jié)構(gòu)選型是關(guān)鍵。通常會(huì)采用鋼結(jié)構(gòu)作為主要支撐體系。鋼結(jié)構(gòu)具有強(qiáng)度高、自重輕的特點(diǎn),能夠承受較大的荷載。通過合理設(shè)計(jì)鋼梁、鋼柱的截面形狀和尺寸,利用鋼材的力學(xué)性能來滿足大跨度的承載需...

